In brief EN 1090 execution classes (EXC1 to EXC4) grade how demanding the fabrication requirements are for structural steelwork, rising with the consequence of failure: EXC1 is the lightest regime and EXC4 the most onerous. The class — normally specified by the designer, with EXC2 the common default for ordinary building structures — drives welding quality management (ISO 3834), procedure and welder qualification, NDT extent and documentation. CE marking under EN 1090-1 requires fabricators to operate factory production control certified for the classes they produce.

Structural steel fabrication welding in progress
Structural steel fabrication welding in progress

Execution classes are where structural steel contracts quietly go wrong. A two-character code on a drawing — EXC2, EXC3 — carries an entire quality regime: welder qualifications, procedure qualifications, NDT percentages, traceability, documentation. Price a job at EXC2 that turns out to be EXC3 and the margin is gone; fabricate at the wrong class and the steel may not be legally supplied. Here is the system, decoded.

What an execution class is

EN 1090-2 (technical requirements for steel structures) grades fabrication requirements into four execution classes, rising with the consequence of failure and the demands of the structure:

Class Typical territory Regime
EXC1 Low-consequence structures — minor agricultural, temporary works Lightest requirements
EXC2 The default for ordinary predominantly static building structures The common commercial baseline
EXC3 Higher-consequence or fatigue-loaded structures — bridges, cranes, key public buildings Substantially tighter welding, NDT and traceability
EXC4 Extreme-consequence structures The most onerous, specified rarely and deliberately

The designer sets the class (per structure, or even per component or detail). If the drawings are silent, do not guess quietly: raise an RFI. EXC2 is the widely applied default for ordinary building structures, but “the drawings didn’t say” has never survived a dispute.

What rises with the class

The execution class scales four things fabricators pay for:

  1. Welding quality management. EN 1090-2 anchors welding to the ISO 3834 series — comprehensive-to-elementary quality requirements depending on class — plus welding coordination with competence appropriate to the work.
  2. Qualification. Welding procedures qualified (ISO 15614-1) and welders certified (EN ISO 9606-1), with scope matched to the joints actually fabricated.
  3. Inspection and NDT. Visual inspection of all welds, plus supplementary NDT (MPI, DPI, UT as applicable) to extents that increase with execution class and joint type — performed by qualified NDT personnel.
  4. Traceability and documentation. Material certificates, weld records and inspection results — the audit trail deepens as the class rises.

None of this is optional decoration: it is what the CE mark attests.

Structural steel components are construction products. Under the Construction Products Regulation, fabricators supplying them in Ireland and across the EU must CE mark to EN 1090-1 — which requires a certified factory production control (FPC) system, assessed by a notified body, covering the execution classes the fabricator produces.

Two practical consequences:

  • A fabricator’s FPC certificate states the classes it may declare. Producing EXC3 work on an EXC2 certificate is non-conformity, however good the welding.
  • The welding chain — procedures, welder certificates, coordination, NDT — is the core of what the FPC audit examines. Weakness there is the most common audit finding.

Metlab supports this chain end to end: as an INAB-accredited certification body (ISO/IEC 17024) we qualify the welders; our laboratory tests the procedure qualification coupons; our CSWIP-qualified inspectors and certified NDT technicians cover production inspection; and our INAB-accredited laboratory (ISO/IEC 17025) gives the results standing an FPC auditor accepts without argument.

The pre-contract checklist

Before pricing or accepting structural steel work:

  • Find the EXC statement. Per structure and per detail — mixed classes on one job are legitimate and common.
  • Check your FPC coverage. Certificate class ≥ contract class, including any subcontracted welding.
  • Map the qualification gap. Which joints need procedures or welder ranges you do not yet hold? Qualification lead time belongs in the programme, not the panic phase.
  • Price the NDT honestly. The class dictates extent; an EXC3 NDT schedule priced at EXC2 rates is a loss booked early.
  • Agree documentation on day one. The handover file is defined by the class — retrofitting traceability is the most expensive way to compile it.

Where fabricators actually stumble

From our inspection work across Irish fabrication: welder certificates with lapsed six-month confirmations; procedures qualified years ago that do not cover a new joint configuration; NDT done but by personnel without the right method certification; and material traceability that dissolves at the subcontractor boundary. Every one is cheap to prevent and expensive to discover during a client audit.

Metlab keeps fabricators audit-ready — welder and procedure qualification, production NDT and independent inspection, from Cork and Dublin. Send us your current certificate matrix and we’ll tell you where the gaps are.

Frequently asked questions

Who decides the execution class for a steel structure?

The designer specifies it, based on consequence of failure, the nature of loading and the complexity of fabrication, following the guidance in the Eurocode/EN 1090 framework. If drawings are silent, the fabricator should raise it — EXC2 is the commonly applied default for ordinary predominantly static building structures, but silence is a specification defect, not a decision.

What does EXC2 require for welding?

In practical terms: welding under a quality regime aligned to ISO 3834 (Part 3 for EXC2), qualified welding procedures (ISO 15614-1) and welders (EN ISO 9606-1), welding coordination with appropriate competence, and NDT of welds to the extent EN 1090-2 sets for the class, performed by qualified personnel.

Do Irish fabricators still need CE marking?

Yes — structural steel components supplied in Ireland and the EU fall under the Construction Products Regulation, and EN 1090-1 is the harmonised standard: CE marking with certified factory production control is required. Fabricators supplying into Great Britain should also track UKCA arrangements applicable to their contracts.

Testing · Inspection · Certification

Put this knowledge to work.

Metlab's engineers apply exactly what you've just read, every day, across Ireland and the UK. Tell us about your asset.