Skip to content

Written by the people who run the tests

Insights.

Standards decoded, methods compared, statutory duties explained — practical technical writing for engineers, contractors and asset owners.

Welder completing a qualification test coupon under examination conditions

Featured · Welding & Certification

Welder Qualification to EN ISO 9606-1: The Complete Guide

What an EN ISO 9606-1 welder qualification involves in Ireland — the test, the ranges, six-month confirmations, and the three revalidation routes explained.

8 July 2026 · Metlab Technical Team

Read
Industrial pressure vessel on site awaiting periodic statutory examination

Pressure Systems · Jul 2026

Pressure Vessel Inspection Intervals in Ireland: Owner’s Guide

What Irish law requires for pressure systems — S.I. 445 of 2012, Part 10 and Schedule 12, the competent person, examination intervals and owner duties.

Read article
Ultrasonic thickness gauge in use on in-service pipework

Non-Destructive Testing · Jun 2026

UT vs RT vs MPI vs DPI: Choosing the Right NDT Method

A practical decision guide to the main NDT methods — what each finds, where each fails, and how to specify the right one for welds and in-service plant.

Read article
Welding procedure specification documents with engineering drawings

Welding & Certification · Jun 2026

WPS vs WPQR: Weld Procedure Qualification Explained

The difference between a WPS and a WPQR, how ISO 15614-1 qualification works, what testing a procedure involves, and when ASME IX applies instead.

Read article
Engineered earthworks under construction quality assurance supervision

Environmental & CQA · Jun 2026

CQA for Landfill & Lining Projects: What the EPA Expects

Why EPA-licensed containment projects need independent CQA — geomembrane seam testing, leak location surveys, clay liner testing and the validation record.

Read article
Concrete test cubes being handled ahead of compressive strength testing

Concrete & Materials · May 2026

Concrete Cube Testing: Why Cubes Fail & How to Avoid It

How concrete cube testing works under I.S. EN 12390 — sampling, curing, 7 vs 28-day results, the real reasons cubes fail, and what to do when one does.

Read article
External corrosion on pipework identified during an integrity survey

Corrosion & Integrity · May 2026

Corrosion Under Insulation (CUI): Finding the Hidden Failure

Why corrosion under insulation is the classic surprise failure on insulated plant, where CUI risk concentrates, and how structured survey programmes detect it.

Read article
Technician scanning a storage tank floor with MFL equipment during an out-of-service inspection

Asset Integrity · Apr 2026

Tank Floor MFL Scanning: Inspecting What You Can’t See

How magnetic flux leakage scanning finds underside corrosion in storage tank floors, and where it fits in EEMUA 159-based tank integrity programmes.

Read article
Butt fusion machine clamped onto polyethylene water main pipe

Pipelines & Plastics · Apr 2026

Butt Fusion vs Electrofusion: PE Pipe Joints Compared

How butt fusion and electrofusion PE joints differ, where each belongs on water networks, why joints fail, and how independent testing proves quality.

Read article
Engineer reviewing accredited test results on a digital report

Quality & Accreditation · Mar 2026

ISO/IEC 17025 Accreditation: Why Your Test Lab Choice Matters

What ISO/IEC 17025 accreditation actually verifies, how it differs from ISO 9001, how to check a lab’s INAB scope, and when specifications should demand it.

Read article
Structural steel fabrication welding in progress

Welding & Certification · Feb 2026

EN 1090 Execution Classes: A Fabricator’s Guide to EXC1–EXC4

How EN 1090 execution classes work, who decides EXC1 to EXC4, what each class demands of welding and testing, and what CE marking requires of Irish fabricators.

Read article

Testing · Inspection · Certification

Reading about it is free. So is asking.

If one of these guides raised a question about your asset or contract, a specialist will answer it — no obligation.